Split

Before the receiving approach: keep three kinds of evidence

A weather product, a navigation notice and an operator instruction have different publishers and validity. A source link is not a checked current issue. Record each relevant original separately; leave missing evidence unresolved.

Record independently
Forecast and separate warning
DHMZ marine forecast for small craft
Navigation and local changes
HHI radio navigational warnings · HHI official navigational publications
Receiving operator and arrival
Port of Split Authority technical information

For each forecast/warning record its named sector, issue, validity and the time you will be in that zone, including a delayed arrival. For a notice record its number, affected location, effective period and cancellation status; do not invent a validity end.

Confirm vessel applicability, the actual berth/entrance, operator contact, current arrival instructions and the planned and delayed ETA. Weather validity does not establish permission, depth or access. Keep operator arrangements in the local-limits notes, separately from weather-warning records.

The saved Port of Split Authority technical page separates Port Operations Centre VHF 09 from mooring VHF 12, the latter explicitly including yachts and other boats. Its pilotage section specifies compulsory pilotage above 500 GT; the ship ETA reporting text must not be copied as a universal small-charter-yacht rule. Confirm which services and reporting apply to your vessel and actual berth. HHI’s web radio-warning list explicitly cannot replace monitoring coast-radio broadcasts and is not official navigation/safety data. Obtain the applicable original warning, number, location, effective period and cancellation status through the responsible channel, independently of DHMZ weather.

Carry these sources into the brief

Split: read the DHMZ Adriatic warning for the actual island route; check the harbour exit and first exposed channel.

What must be confirmed before using these times?
  1. DHMZ’s small-craft page separates Warning, the first 12 hours and the next 12 hours. The retrieved issue line gives a date and hour without an explicit time-zone label. Do not assume that the printed hour is UTC or calculate a validity end until the issuer’s clock and period anchor are confirmed.
  2. HHI’s web radio-warning list is a lead, not a replacement for coast-radio monitoring or the applicable original. Obtain the warning number, affected location, effective period and cancellation status through the responsible channel. Record an unconfirmed end as unknown; do not copy the weather forecast’s end into a notice.
  3. The Port of Split technical page lists pilot radio service 06:00–20:00 in one table and pilotage working hours 00:00–24:00 in another section. Confirm which service and hours apply to your vessel and ETA; do not infer round-the-clock pilot availability. The compulsory-pilotage statement above 500 GT is not a universal charter-yacht rule. Confirm the receiving berth separately from port traffic contact.

Official source-path and document check: 9 November 2026. This is not a current forecast, verified route or port-entry permission.

Forecast sectors and coverage

Use the applicable DHMZ Adriatic warning and marine text for the actual island route. Split, Trogir and Marina Agana are distinct departure locations; this page’s map centre is not the coordinates of all charter bases nearby.

Weather-sensitive legs

Identify the harbour exit and first exposed island channel before choosing the start time. If forecast bura/jugo or a direction shift changes arrival shelter, reassess the destination rather than only the marina wind.

Observations, sea state and reassessment

Confirm the exact berth/entrance and an observation representative of the exposed leg, if available. Inspect timestamp, sensor status and forecast issue separately. Missing observations or local approach/current information remain explicit gaps; this page does not certify depth, navigability or port permission.

Worked planning scenario — not a live forecast

Compare two departure times at the harbour exit, first exposed leg and arrival ETA. Record the next official check and a verified alternative before the point of commitment. If the later option is better only at the berth, it has not yet improved the passage as a whole.

Official sources: what to check

Sector names help you locate the issuing product; they are not an automatic route-coverage match. Open the current issue and check boundaries, issue time and validity. This page does not display current warnings; an unavailable product does not mean no hazard.

Waters and sailing options

Countries & territories

Confirm the receiving berth and port contact

The Port of Split Authority technical information identifies its Port Operations Centre on VHF channel 09 and lists pilotage and mooring as separate services. Confirm the contact and arrival instructions for your actual marina or berth and vessel; a port traffic contact is not a berth reservation or clearance for a nearby charter base. If handover or sailing time changes your ETA, reconfirm the receiving arrangements before committing to the harbour approach.

Map orientation

The approximate map centre is not an approach waypoint, track, depth survey or forecast-zone boundary. The third-party map loads only on request.

Open map separately

Build your passage brief

Two free tools are available: record official marine information you have checked, or compare model samples at your chosen points. AI explanation and specialist review remain a closed pilot.

Carry these sources into the brief

A Sailing Weather editorial guide to local conditions, practical passage preparation and marine-weather sources. Source and structure review: 27 September 2026. For a specific passage, check current issues, validity and forecast coverage. The skipper retains the final decision and responsibility.

The first day starts at the actual charter base

Use the departure berth and actual first island leg, whether the boat is in Split, Trogir or another nearby base. A country or city map centre does not identify the harbour exit or the route's first open gap. A late handover changes the arrival ETA and daylight constraint. Compare a short staging leg with continuing to the original island; do not rank those options by marina wind alone.

Keep return-day and navigation evidence

Record the final charter return as its own marine leg with valid forecast coverage. The planned home base may face a different wind/wave angle from the outward arrival. Use HHI and the applicable harbour sources for navigation changes independently of DHMZ weather. A model's calmer return-hour wind cannot establish clear access or remove a current warning; retain both tasks visibly in the brief.

Source-path and operator-document review: 8 November 2026. This is the editorial check date, not a bulletin issue or evidence of current access. Unresolved originals are identified above; obtain current applicable forecasts, warnings and receiving-operator instructions before departure.